Test Methods and Specifications

Cover of Construction of Unbound Granular Pavements
Construction of Unbound Granular Pavements
  • Publication no: ATS-3310-25
  • Published: 23 September 2025
  • Edition: 1.0

Austroads Technical Specification ATS 3310 sets out the requirements for the construction of an unbound granular pavement.

The following is excluded from the scope of ATS 3310:

a) the construction of pavements using Marginal/Non-standard Materials; and
b) the supply of granular pavement materials.

This technical specification is also available as a Word document.

  • 1. Scope
  • 2. Referenced Documents
  • 3. Definitions
  • 4. Quality System Requirements
  • 5. Constituent Materials
    • General
    • Granular Pavement Material
    • Stockpiling of Granular Material
    • Water
    • Testing and Approval of Constituent Materials
  • 6. Plant and Equipment
    • General
    • Paver
    • Intelligent Construction Rollers
  • 7. Construction
    • Quality Plan
    • Existing Structures and Utilities
    • General
    • Trial Pavement
    • Management of the Moisture Content
    • Spreading, Compaction and Trimming
    • Intelligent Construction
    • Construction Joints
    • Segregation
    • Surface of the Pavement Layer
    • Protection and Maintenance of the Works
  • 8. Conformity of the Pavement Layers
    • Quality Plan
    • Conformance Testing
    • Surface Finish
    • Road Roughness
    • Compaction
    • Post Compaction Particle Size Distribution
    • Ball Penetration Testing
    • Dryback
    • Proof Rolling
  • 9. Conformity – Geometrics
    • General
    • Geometric Tolerances
    • Surface Levels
    • Deviation from a Straightedge
    • Crossfall
  • 10. Acceptance
  • Annexure A Summary of Hold Points, Witness Points and Records
  • Annexure B Examples of Pavements Surfaces Prior to Bituminous Surfacing
  • Amendment Record
  • Attachment A Contract Specific Requirements