Austroads Technical Specification ATS 3320 sets out the requirements for the construction of a stabilised pavement using cement or cementitious binders that have been mixed in a stationary pugmill.
The technical requirements for the mix design of the stabilised material are excluded from this Specification.
The technical specification can also be downloaded as a Word document.
- 1. Scope
- 2. Referenced Documents
- 3. Definitions
- 4. Quality System Requirements
- 5. Approval of the Mix Design
- 6. Constituent Materials
- General
- Material to be Stabilised
- Stockpiling of Material to be Stabilised
- Stabilising Binders
- Retarder
- Water
- Testing and Approval of Constituent Materials
- 7. Plant and Equipment
- General
- Intelligent Construction Rollers
- 8. Construction of the Stabilised Pavement
- General
- Trial Pavement
- Working Time
- Conditions for Placement of Stabilised Material
- Material Not Incorporated into the Pavement
- Segregation During Construction
- 9. Preparatory Work
- Preparation of the Existing Surface
- 10. Manufacture of the Stabilised Material
- General
- Process Control
- Handling and Transportation of Stabilised Material
- 11. Conformity of the Manufactured Stabilised Material
- Properties of the Stabilised Material
- Testing for Unconfined Compressive Strength
- 12. Lightly Bound Pavement Layer
- 13. Placing, Shaping and Compacting the Stabilised Material
- General
- Moisture Content of the Mixture
- Placement
- Intelligent Construction
- Construction Joints
- Trafficking the Stabilised Layer
- Curing
- Maintenance of the Stabilised Layer
- 14. Conformity of the Stabilised Pavement
- General
- Conformance Testing
- Surface Finish
- Road Roughness
- Compaction
- Ball Penetration Testing
- Proof Rolling
- 15. Conformity – Geometrics
- General
- Geometric Tolerances
- Vertical Tolerances
- Deviation from a Straightedge
- Crossfall
- 16. Acceptance
- Annexure A Summary of Hold Points, Witness Points and Records
- Amendment Record
- Attachment A Contract Specific Requirements