Test Methods and Specifications
Plant Mix Pavement Stabilisation Using Foamed Bitumen
- Publication no: ATS-3340-25
- Published: 17 September 2025
- Edition: 1.0
- PDF (free) Download
Austroads Technical Specification ATS 3340 sets out the requirements for the construction of a stabilised pavement using foamed bitumen and secondary stabilising binders that has been mixed in a stationary pugmill.
The technical requirements for the mix design of the stabilised material are excluded from this Specification.
This technical specification is also available as a Word document.
- 1. Scope
- 2. Referenced Documents
- 3. Definitions
- 4. Quality System Requirements
- 5. Approval of the Mix Design
- 6. Constituent Materials
- General
- Material to be Stabilised
- Stockpiling of Material to be Stabilised
- Stabilising Binders
- Water
- Foaming Agent
- Testing and Approval of Constituent Materials
- 7. Plant and Equipment
- General
- Manufacturing, Mixing, Delivery and Paving Equipment
- Intelligent Construction Rollers
- 8. Construction of the Stabilised Pavement
- Quality Plan
- Preparatory Work
- Manufacture of the Stabilised Material
- Placement
- Stabilised Material Placed in Two Layers (where applicable)
- General
- Trial Pavement
- Allowable Working Time
- Conditions for Placement of Stabilised Material
- Material Not Incorporated into the Pavement
- Segregation
- Quality Plan
- 9. Preparatory Work
- Existing Structures and Utilities
- Preparation of the Existing Surface
- Crack Filling
- Strain Alleviating Geotextile Strips
- 10. Manufacture of the Stabilised Material
- General
- Plant Calibration
- Temperature of Material to be Stabilised
- Production of the Foamed Bitumen
- Moisture Ratio (uncompacted) of Feed Stockpile (MRu FSP)
- Primary Stabilising Binder Content
- Secondary Stabilising Binder Content
- Moisture Ratio Foamed Bitumen (MRu FB)
- Resilient Modulus (Ex-plant)
- Stockpiling of Stabilised Material
- 11. Conformity of the Manufactured Stabilised Material
- 12. Placing, Shaping and Compacting the Stabilised Material
- General
- Layer Thickness
- Placement
- Intelligent Construction
- Construction Joints
- Compaction
- Trimming After Compaction
- Trafficking the Stabilised Layer
- Curing
- Maintenance of the Stabilised Layer
- 13. Placement of Stabilised Material in Two Layers
- General
- Preparation Prior to Placing an Overlying Stabilised Layer
- Hard-Cut Method
- Spray Seal Interlayer
- Padfoot Surface Preparation
- 14. Conformity of the Stabilised Pavement
- General
- Conformance Testing
- Time Limits for Testing
- Surface Finish
- Road Roughness
- Compaction
- Proof Rolling
- 15. Conformity – Geometrics
- General
- Geometric Tolerances
- Vertical Tolerances
- Deviation from a Straightedge
- Crossfall
- 16. Acceptance
- Annexure A Summary of Hold Points, Witness Points and Records
- Annexure B Examples of Pavement Layer Surfaces
- Amendment Record Attachment
- Attachment A: Contract Specific Requirements