Project Number: APT6250
Start: 3-02-2022
End: 3-08-2028
The purpose of this project is to improve the design, efficiency and performance of treatments that extend the structural life of existing pavements. The project will develop up-to-date back-analysis software for more consistent assessments of existing pavements and the design of treatments for them through back-calculation results.
Proposed outputs: Guide or update to Guide, Technical report
Consultants: WSP Australia Pty Limited
Program: Transport Infrastructure [Pavement]
Status: Active