Temporary Traffic Management
Guide to Temporary Traffic Management Part 5: Short Term Low Impact Worksites
- Publication no: AGTTM05-19
- ISBN: 978-1-925854-61-9
- Published: 10 December 2019
- Edition: 1.0
- Superseded
- PDF (free) Download
Guide to Temporary Traffic Management Part 5: Short Term Low Impact Worksites identifies and details preferred temporary traffic management design and operational practices to be applied for short term low impact works on or near roads.
- 1. Introduction
- 1.1 Purpose
- 1.2 Structure of AGTTM
- 1.3 Scope of Part 5
- 1.4 Application of Part 5 to New Zealand
- 1.5 Definitions
- 2. Design Process
- 2.1 General
- 2.2 Risk Assessment
- 2.2.1 Risk considerations
- 2.2.2 Specific considerations for short-term low impact works
- 2.3 Design Balance
- 2.4 Essential Design Principles
- 2.4.1 Sight distance
- 2.4.2 Signs
- 2.4.3 Road categories
- 2.4.4 Lane width
- 2.4.5 Traffic volumes
- 2.4.6 Speed
- 2.5 Variations to Design
- 3. General Considerations
- 3.1 Restrictions on Use
- 3.2 Short Term Low Impact Options
- 3.3 Vulnerable Road Users
- 3.4 Vehicle Mounted Warning Device
- 4. Works on Road – Within Traffic Lane
- 4.1 Work Protected by Specialist Vehicles
- 4.1.1 General
- 4.1.2 Truck mounted attenuators
- 4.2 Work Between Gaps in Traffic
- 4.2.1 Description
- 4.2.2 Criteria
- 4.2.3 Traffic control devices
- 4.2.4 Pre-installation processes
- 4.2.5 Installation (TGS instruction)
- 4.2.6 Close out process
- 4.3 Short Term Works in Traffic
- 4.3.1 Description
- 4.3.2 Criteria
- 4.3.3 Traffic control devices
- 4.3.4 Pre-installation processes
- 4.3.5 Installation (TGS instruction)
- 4.3.6 Close out process
- 4.4 Frequently Changing Work Area – In Lane
- 4.4.1 Description
- 4.4.2 Criteria
- 4.4.3 Traffic control devices
- 4.4.4 Pre-installation processes
- 4.4.5 Installation (TGS instruction)
- 4.4.6 Close out processes
- 4.5 Constantly Moving Work Area – In Lane
- 4.5.1 Description
- 4.5.2 Criteria
- 4.5.3 Traffic control devices
- 4.5.4 Pre-installation processes
- 4.5.5 Installation (TGS instruction)
- 4.5.6 Close out processes
- 4.1 Work Protected by Specialist Vehicles
- 5. Works Outside of Traffic Lane
- 5.1 Shoulders, Medians, Verges and Footpaths with Workers on Foot or Small Plant Items Only
- 5.1.1 Description
- 5.1.2 Criteria
- 5.1.3 Traffic control devices
- 5.1.4 Pre-installation processes
- 5.1.5 Installation (TGS instruction)
- 5.1.6 Close out processes
- 5.2 Shoulders, Medians, Verges and Footpaths with Large Plant Items Only
- 5.2.1 Description
- 5.2.2 Criteria
- 5.2.3 Traffic control devices
- 5.2.4 Pre-installation processes
- 5.2.5 Installation (TGS instruction)
- 5.2.6 Close out processes
- 5.3 Frequently Changing Work Area Outside of a Traffic Lane
- 5.3.1 Description
- 5.3.2 Criteria
- 5.3.3 Traffic control devices
- 5.3.4 Pre-installation processes
- 5.3.5 Installation (TGS instruction)
- 5.3.6 Close out processes
- 5.1 Shoulders, Medians, Verges and Footpaths with Workers on Foot or Small Plant Items Only
- References
Related publications
Latest Temporary Traffic Management News