Temporary Traffic Management

Cover of Guide to Temporary Traffic Management Part 6: Field Staff – Implementation and Operation
Guide to Temporary Traffic Management Part 6: Field Staff – Implementation and Operation
  • Publication no: AGTTM06-19
  • ISBN: 978-1-925854-62-6
  • Published: 10 December 2019
  • Edition: 1.0
  • Superseded

Guide to Temporary Traffic Management Part 6: Field Staff – Implementation and Operation sets out the requirements of field staff in the process of installing, monitoring and dismantling traffic management on public roads.

  • 1. Introduction
    • 1.1 Purpose
    • 1.2 Structure of AGTTM
    • 1.3 Scope of Part 6
    • 1.4 Field Work for Office-based Staff
    • 1.5 Application of Part 6 to New Zealand
    • 1.6 Acronyms
    • 1.7 Definitions
  • 2. TTM Principles and Road Categories
    • 2.1 TTM Principles
      • 2.1.1 Fundamentals
      • 2.1.2 Basic principles
    • 2.2 Traffic Management Implementer
    • 2.3 Road Categorisation
  • 3. Roles and Responsibilities
    • 3.1 TTM Roles
      • 3.1.1 Other TTM workers
    • 3.2 Example – Career Path Progression
    • 3.3 TTM Relationships
      • 3.3.1 Principal Contractor – TTM responsibilities
      • 3.3.2 TMD
      • 3.3.3 TMI responsibilities for TTM on a worksite include:
      • 3.3.4 Interactions between the Principal Contractor and the TMI
      • 3.3.5 TMI - TC/Other TTM worker interactions
      • 3.3.6 Traffic Controller (TC)
      • 3.3.7 Other TTM workers
  • 4. Pre-Shift Activities
    • 4.1 General
    • 4.2 Vehicle Checks
    • 4.3 Job Pack Check
    • 4.4 Equipment and Devices
    • 4.5 Condition of Devices
      • 4.5.1 Cleanliness
      • 4.5.2 Colour of fluorescent signs
      • 4.5.3 Low light visibility
    • 4.6 Resources
  • 5. Pre-start
    • 5.1 General
      • 5.1.1 Identify hazards
      • 5.1.2 Assess the risk
      • 5.1.3 Implement controls
      • 5.1.4 Monitor and review
    • 5.2 TMP and TGS Development - Residual Risk Register
    • 5.3 On Site Safety Analysis and Risk Assessment
    • 5.4 Toolbox Talks
      • 5.4.1 TTM staff
      • 5.4.2 Construction workers/visitors
  • 6. TGS Installation
    • 6.1 General
    • 6.2 Typical Installation Principles
    • 6.3 Installation Process
    • 6.4 Placement of Signs and Devices
      • 6.4.1 Two-way road - lane closure
      • 6.4.2 Two-way road (lateral shift)
      • 6.4.3 Two-way road - lane closure with side roads
      • 6.4.4 Multi-lane un-divided road - lane closure
      • 6.4.5 Multi-lane divided road - left or right lane closure
    • 6.5 Positioning of Signs and Devices
    • 6.6 Typical Locations for Signs
      • 6.6.1 Long term
      • 6.6.2 Short term
    • 6.7 Orientation of Signs and Devices
    • 6.8 Tolerances
    • 6.9 ITS Devices
  • 7. TGS Operations and Maintenance
    • 7.1 General
    • 7.2 Before Work Starts
    • 7.3 During the Hours of Work
    • 7.4 Aftercare - Worksite Arrangements Outside Working Hours
    • 7.5 Record Keeping
    • 7.6 Incidents
    • 7.7 TMI Monitoring
    • 7.8 Monitor and Measure TTM
    • 7.9 Excessive or Inappropriate Use of Temporary Speed Limits
    • 7.10 Excessive Signage
  • 8. TGS Removal
    • 8.1 General
    • 8.2 Typical Removal Principles
    • 8.3 Removal Process
    • 8.4 Removal Order for Signs and Devices
      • 8.4.1 Two-way road – lane closure
      • 8.4.2 Two-way road – lateral shift
      • 8.4.3 Two-way road – lane closure with side road intersections
      • 8.4.4 Multi-lane un-divided road – lane closure
      • 8.4.5 Multi-lane divided road – left or right lane closure
  • 9. Low Light Works
    • 9.1 Activity During Low Light
    • 9.2 Artificial Lighting
  • 10. Unattended Sites
  • Appendix A Sample TTM Career Path Stages
  • Appendix B Sample Risk Assessment Form
  • Appendix C Sample Toolbox Talk
  • Appendix D Sample Daily Traffic Management Diary