Temporary Traffic Management

Cover of Guide to Temporary Traffic Management Part 9: Sample Layouts
Guide to Temporary Traffic Management Part 9: Sample Layouts
  • Publication no: AGTTM09-26
  • ISBN: 978-1-923617-09-4
  • Published: 26 May 2026
  • Edition: 1.2

Guide to Temporary Traffic Management Part 9: Sample Layouts provides illustrative and educational sample layouts to support the other parts of AGTTM and to assist Traffic Management Designers in the interpretation of the various requirements of this AGTTM.

Download the supporting report

Austroads report AP-R765-26 documents content and referencing changes made in Edition 1.2 of the Austroads Guide to Temporary Traffic Management (AGTTM) Parts 1 through Part 7, Part 9 and Part 10, published in May 2026.

Join the webinars

Austroads has organised a series of webinars to outline the updates:

6 July 2026 – Updates to the Austroads Guide to Temporary Traffic Management in Edition 1.2

4 August 2026 – Using and Understanding the Austroads Guide to Temporary Traffic Management for Traffic Management Designers

1 September 2026 – Using and Understanding the Austroads Guide to Temporary Traffic Management for Road Infrastructure Managers

20 October 2026 – Using and Understanding the Austroads Guide to Temporary Traffic Management for Traffic Controllers & Traffic Management Implementers

24 November 2026 – Using and Understanding the Austroads Guide to Temporary Traffic Management for Project Managers and Clients of TTM Providers

No charge but registration is essential. Can't make the live session? Register and we'll send you a link to the recording.

Edition 1.2 published May 2026

Edition 1.2 contains:

  • amendments to sample layouts 31 and 42
  • minor changes throughout.

Superseded editions:

Edition 1.1 published September 2021

Edition 1.0 published December 2019

  • 1. Introduction
    • 1.1 Scope of Part 9
    • 1.2 Structure of AGTTM
    • 1.3 Heading discontinued from Edition 1.1
    • 1.4 Application of Part 9 to New Zealand
    • 1.5 Definitions
  • 2. Sample Layouts
    • 2.1 Objectives
    • 2.2 Sample layout content and structure
  • 3. Summary of Scenarios
    • 3.1 Static worksites (AGTTM Part 3)
      • 3.1.1 Around worksites
      • 3.1.2 Through worksites
      • 3.1.3 Past worksites
      • 3.1.4 Worksites at roundabouts
    • 3.2 Mobile works (AGTTM Part 4)
      • 3.2.1 Mobile works
      • 3.2.2 Works on unsealed roads
    • 3.3 Short term or low impact worksites (AGTTM Part 5)
      • 3.3.1 Works on road
      • 3.3.2 Works outside of traffic lane
    • 3.4 Worked examples
  • 4. AGTTM Feedback
  • Appendix A Sample Layouts (Around Worksites)
  • Appendix B Sample Layouts (Through Worksites)
  • Appendix C Sample Layouts (Past Worksites)
  • Appendix D Sample Layouts (Worksites at Roundabouts)
  • Appendix E Sample Layouts (Mobile Works)
  • Appendix F Sample Layouts (Work on Unsealed Roads)
  • Appendix G Sample Layouts (Short Term Low Impact – Works on Roads)
  • Appendix H Sample Layouts (Short Term Low Impact – Works off Roads)
  • Appendix I Sample Layouts (Worked Examples)