Temporary Traffic Management

Cover of Guide to Temporary Traffic Management Part 10: Supporting Guidance
Guide to Temporary Traffic Management Part 10: Supporting Guidance
  • Publication no: AGTTM10-26
  • ISBN: 978-1-923617-25-4
  • Published: 26 May 2026
  • Edition: 1.2

Guide to Temporary Traffic Management Part 10: Supporting Guidance provides information on a range of topics to support the information contained within the other parts of AGTTM. The information includes risk management processes, review, inspection and road safety audit of worksites, events and emergency works.

Download the supporting report

Austroads report Updates to Austroads Guide to Temporary Traffic Management Edition 1.2 (AP-R765-26) documents content and referencing changes made to Parts 1 through Part 7, Part 9 and Part 10 of AGTTM in Edition 1.2.

Webinar

Watch a recording of the webinar to learn more.

Edition 1.2 published May 2026

Edition 1.2 contains:

  • updated content relating to major changes in AGTTM Part 8
  • updated and new guidance relating to TTM assurance practices
  • minor amendments for clarity and consistency.

Superseded editions:

Edition 1.1 published September 2021

Edition 1.0 published December 2019

  • 1. Introduction
    • 1.1 Scope of Part 10
    • 1.2 Structure of AGTTM
    • 1.3 Heading discontinued from Edition 1.1
    • 1.4 Application of Part 10 to New Zealand
    • 1.5 Definitions
  • 2. Risk Management for TTM
    • 2.1 General
    • 2.2 Overview
    • 2.3 Application to TTM at worksites on roads
    • 2.4 Elements of best practice
      • 2.4.1 A model risk management process
      • 2.4.2 Step 1 – Determine the site risk rating for planning of TTM
      • 2.4.3 Step 2 – Determine the required level of planning
      • 2.4.4 Step 3 – Consider risk at the worksite
      • 2.4.5 Step 4 – Consider risk control measures
      • 2.4.6 Step 5 – Select risk controls
      • 2.4.7 Documentation of risks
  • 3. Assurance Systems, Methods and Processes
    • 3.1 General
      • 3.1.1 Overview
      • 3.1.2 Outcomes
      • 3.1.3 Triggers for assurance systems and processes
    • 3.2 Assurance types
      • 3.2.1 Reviews
      • 3.2.2 Inspections
      • 3.2.3 Monitoring
      • 3.2.4 Audits
      • 3.2.5 Evaluations
    • 3.3 Considerations
      • 3.3.1 Assurance within TTM project stages
      • 3.3.2 Roles and responsibilities
      • 3.3.3 Record keeping
  • 4. Events on Roads
    • 4.1 General
    • 4.2 Principles
    • 4.3 The event TMP
    • 4.4 Event traffic marshals
    • 4.5 Event traffic management signage
    • 4.6 Risk factors for events
  • 5. Emergency Works
    • 5.1 General
    • 5.2 Initial response
    • 5.3 Interim response
    • 5.4 Follow up protection
  • 6. AGTTM Feedback
  • Appendix A Example Compliance Inspection Checklist