Austroads Technical Specification ATS 3450 sets out the requirements for the manufacture and placement of microsurfacing for use on road pavements and includes requirements for the following:

  1. component materials
  2. properties of the microsurfacing
  3. mix design responsibility
  4. manufacturing and application
  5. sampling and testing.

The technical specification can also be downloaded as a Word document.

Edition 1.2 published January 2023

The following changes were made to edition 1.2:

  • Table 4.1 change to requirements for mix design.
  • Clause 6.7 clarification in relation to percentage points.
  • Clause 7.3 clarification of statement to be submitted.
  • Clause 9.1 and 9.3 amendment to trial mix requirement.
  • Clause 9.13 clarification of rut-filling.
  • Table 10.6 amendment to mineral filler test frequency.

Superseded editions

Edition 1.1 published February 2022 (PDF | Word)

The following changes were made to edition 1.1:

  • Austroads test method number updated in Clause 2.1 and Table 10.6.
  • Clause 6.7 correction to percentage variance allowed in mineral filler added to the mixed materials during placement.
  • Clause 8.5 change of terminology in relation to the certificate of calibration.
  • Clause 9.23 clarification of traffic type.
  • Clause 10.4 clarification in relation to lot.
  • Clause 10.6, new note (1) added to table.

Edition 1.0 published April 2021 (PDF | Word)

  • 1. Scope
  • 2. Referenced Documents
  • 3. Definitions
  • 4. Quality System Requirements
  • 5. Program of Work
  • 6. Materials
    • Mineral aggregate
    • Mineral filler
    • Binder
    • Water
    • Additives
  • 7. Mix Design
    • Responsibility for mix design
    • Mix design criteria
    • Mix design submission
  • 8. Plant
    • Provision of plant and equipment
    • Paving unit calibration
  • 9. Field Application
    • Placement trial
    • General
    • Cleaning
    • Protection of services and road fixtures
    • Tack coat
    • Water fog coat
    • Weather limitations
    • Rut-filling and correction
    • Production of microsurfacing mix
    • Control of traffic
    • Rolling
  • 10. Sampling and Testing
    • General
    • Sampling
    • Compliance testing
  • 11. Defective Work or Materials
  • Annexure A: Summary of Hold Points, Witness Points and Records