Austroads Technical Specification ATS 5130 sets out the requirements for the construction of soil nails for the strengthening of earth slopes. It includes:

  • supply of materials;
  • installation of soil nails;
  • compliance testing; and
  • concrete facing work on the slope surface.

This technical specification can also be downloaded as a Word document.

  • 1. Scope
  • 2. Referenced Documents
  • 3. Definitions
  • 4. Quality System Requirements
  • 5. Professional Engineer
  • 6. Materials
    • General
    • Soil Nails
    • Couplers
    • Nuts
    • Encapsulation (Corrugated Plastic Sheath)
    • Centralisers
    • Grout Tubes
    • Grout
    • Nail Heads and Bearing Plates
    • Storage and Handling
    • Materials for Concrete Facing
    • Flexible Strip Filter Drains
  • 7. Construction Sequence
  • 8. Soil Nail Installation
    • General
    • Set Out and Drilling
    • Insertion of Soil Nails
    • Grouting Equipment
    • Grout Mixing
    • Grouting
    • Loss or Leakage of Grout
    • Bleed Testing
    • Fluidity Testing
    • Compressive Strength Test
    • Fitting of Galvanized Nuts and Bearing Plates
    • Construction Conformity Record
  • 9. Instrumented Soil Nail
  • 10. Soil Nail Testing
  • General
    • Type I Testing
    • Type II Testing
    • Type III Testing
    • Test Load Cycles
    • Acceptance Criteria
    • Measurement of Loading and Movement
    • Records of Tests
  • 11. Placement of Concrete Facing
    • General
    • Slope Surface Preparation
    • Installation of Steel Mesh Support Anchor Bars
    • Horizontal Drains
    • Application of Shotcrete
    • Construction Joints
    • Checking Integrity of Shotcrete
  • 12. Sub-Surface Drainage
  • Annexure A: Summary of Hold Points, Witness Points and Records
  • Annexure B: Soil Nail Instrumentation Requirements
  • Amendment Record