Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Environment & Sustainability
Toggle
Environment & Sustainability
This section covers Austroads' work on Sustainability, and the work of the Environment and Sustainability Task Force.
Environment & Sustainability Task Force and Projects
Austroads' Work on Sustainability
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Careers
Login
Home
Publications
Publications
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
Technical Reports
2
Topic
Topic
Active travel
1
Bicycles
8
Bridge assessment
23
Bridge barriers
4
Bridge components
16
Bridge construction
39
Bridge design
69
Bridge maintenance
13
Bridge management
21
Bridge materials
26
Bridge performance
8
Concrete
21
Digital engineering (BIM)
6
Fibre reinforced polymer
5
Heavy vehicle access
3
Heavy vehicle weighing
2
Pedestrians
12
Project governance
1
Rail bridges
15
Rural and remote
3
Steel
16
Structure management
2
Structures management
10
Timber
3
Waterway design
1
Year
Year
2017
2014
271
2011
307
Publication State
Publication State
Live
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 163 Publications
Bridges
Remove Bridges filter
Conference Papers
Remove Conference Papers filter
2017
Remove 2017 filter
Live
Remove Live filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
2017 Revision of Australian Standard AS 5100 Part 1: Scope and General
ABC2017-132-17
26 Apr 2017
Bridges
More
AS 5100 is the only Australian standard specific to bridges. For the first time, the scope has been extended from primarily a structural design standard to include other bridge related topics including safety-in-design, climate change and…
2017 Revision of Australian Standard AS 5100 Part 2: Design Loads
ABC2017-133-17
26 Apr 2017
Bridges
More
Part 2 Design loads of Australian Standard AS 5100 Bridge design sets out the parameters for loads on all bridges in Australia. There have been numerous enhancements to improve the scope, clarity and intent. Design loads for road traffic barriers…
3D BIM Modelling Challenges for the Bridge over Uarbry Causeway
ABC2017-040-17
20 Apr 2017
Bridges
More
Roads and Maritime Services (Roads and Maritime) has engaged Opus International Consultants (Opus) to undertake the detailed design and preparation of tender documentation for the bridge over Uarbry Causeway on the Golden Highway (HW27), 64.4km west…
A Comparison of the Effect of Pier Shape on Flood Loading on Bridges
ABC2017-092-17
21 Apr 2017
Bridges
More
The resistance to flood and debris loading are critical parameters affecting design of bridges under flood loading. For instance, bridges which are under extreme flood could partially or completely immerse in the water, resulting in very notable…
A Drift and Displacement Based Seismic Assessment Method for Bridge Abutments
ABC2017-130-17
26 Apr 2017
Bridges
More
The present study is concerned with the drift and displacement based seismic assessment of bridge abutments. This study is distinguished from previous research that has been reported in the literature in that what is of primary interests is the…
A New Damage Indicator for Drive-by Monitoring using Instantaneous Curvature
ABC2017-044-17
20 Apr 2017
Bridges
More
Drive-by monitoring has enhanced the possibilities for bridge damage detection, with the potential to deliver a bridge rating in the time it takes an instrumented vehicle to pass overhead. This paper outlines the importance of Instantaneous…
A Rail Bridge in Twenty Days: The Torrens To Torrens North:South Corridor Upgrade
ABC2017-149-17
26 Apr 2017
Bridges
More
The Torrens Road to Torrens River (T2T) project forms part of the overall North-South Road Corridor upgrade in Adelaide, South Australia and incorporates many components such as a new lowered motorway, road, service and pedestrian bridges, retaining…
A Simple Method of Launch Geometry Design of Prestressed Concrete Bridge in Three Dimensional Space
ABC2017-161-17
26 Apr 2017
Bridges
More
Incrementally launched prestressed concrete bridges are built in segments in the casting bed. Finished segments are pushed out of the casting bed to leave space for construction of subsequent segments. The resulting geometry of the bridge will be…
A Vehicle Assessment Tool for Access Decision Support
ABC2017-030-17
20 Apr 2017
Bridges
More
Bridges on the Australian highway network are ageing, just as economic demands require increasing freight volumes. New trucks are continually being developed, and this has accelerated under the new National Heavy Vehicle Regulator’s Performance-…
ABC2017-003-17
ABC2017-003-17
20 Apr 2017
Bridges
More
Munna Point Bridge was built in Noosa Heads, Queensland in the late 1970s. Over 1.8 million trips in each direction are made across the 106 metre bridge every year, by tourists and locals. The bridge is one of only two routes to reach the primary…
1
2
3
4
5
Next
Latest Bridges news
10 Apr 2024
12th Austroads Bridge Conference to be held in Brisbane
27 Mar 2024
Austroads guidance on bridge maintenance and management updated
31 Oct 2023
New Austroads technical specifications on bridgeworks published
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No