Temporary Traffic Management

Cover of Guide to Temporary Traffic Management Part 6: Field Staff – Implementation and Operation
Guide to Temporary Traffic Management Part 6: Field Staff – Implementation and Operation
  • Publication no: AGTTM06-26
  • ISBN: 978-1-923617-08-7
  • Published: 26 May 2026
  • Edition: 1.2

Guide to Temporary Traffic Management Part 6: Field Staff – Implementation and Operation sets out the requirements of field staff in the process of installing, monitoring and dismantling traffic management on public roads.

Download the supporting report

Austroads report AP-R765-26 documents content and referencing changes made in Edition 1.2 of the Austroads Guide to Temporary Traffic Management (AGTTM) Parts 1 through Part 7, Part 9 and Part 10, published in May 2026.

Join the webinars

Austroads has organised a series of webinars to outline the updates:

6 July 2026 – Updates to the Austroads Guide to Temporary Traffic Management in Edition 1.2

4 August 2026 – Using and Understanding the Austroads Guide to Temporary Traffic Management for Traffic Management Designers

1 September 2026 – Using and Understanding the Austroads Guide to Temporary Traffic Management for Road Infrastructure Managers

20 October 2026 – Using and Understanding the Austroads Guide to Temporary Traffic Management for Traffic Controllers & Traffic Management Implementers

24 November 2026 – Using and Understanding the Austroads Guide to Temporary Traffic Management for Project Managers and Clients of TTM Providers

No charge but registration is essential. Can't make the live session? Register and we'll send you a link to the recording.

Edition 1.2 published May 2026

Edition 1.2 contains:

  • updated content relating to major changes in AGTTM Part 8
  • additional guidance for supervision of Traffic Management Implementors in training
  • minor amendments for clarity and consistency.

Superseded editions:

Edition 1.1 published September 2021

Edition 1.0 published December 2019

  • 1. Introduction
    • 1.1 Scope of Part 6
    • 1.2 Structure of AGTTM
    • 1.3 Heading discontinued from Edition 1.1
    • 1.4 Field work for office-based staff
    • 1.5 Application of Part 6 to New Zealand
    • 1.6 Acronyms
    • 1.7 Definitions
  • 2. TTM Principles and Road Categories
    • 2.1 TTM principles
      • 2.1.1 Fundamentals
      • 2.1.2 Basic principles
    • 2.2 Traffic management implementer
    • 2.3 TTM categories
  • 3. Roles and Responsibilities
    • 3.1 TTM roles
    • 3.2 Heading discontinued from Edition 1.1
    • 3.3 TTM relationships
      • 3.3.1 Principal Contractor – TTM responsibilities
      • 3.3.2 TMD
      • 3.3.3 TMI responsibilities for TTM on a worksite
      • 3.3.4 Interactions between the Principal Contractor and the TMI
      • 3.3.5 TMI – TC/other TTM worker interactions
      • 3.3.6 Traffic Controller (TC)
      • 3.3.7 Other TTM workers
      • 3.3.8 Supervising a TMI in training
  • 4. Pre-Shift Activities
    • 4.1 General
    • 4.2 Vehicle checks
    • 4.3 Job pack check
    • 4.4 Equipment and devices
    • 4.5 Condition of devices
    • 4.6 Availability of TTM personnel
  • 5. Pre-Start
    • 5.1 General
      • 5.1.1 Identify hazards
      • 5.1.2 Assess the risk
      • 5.1.3 Implement controls
      • 5.1.4 Monitor and review
    • 5.2 TMP and TGS development – residual risk register
    • 5.3 On-site safety analysis and risk assessment
    • 5.4 TTM toolbox talks
      • 5.4.1 TTM staff
      • 5.4.2 Construction workers/visitors
  • 6. TGS Installation
    • 6.1 General
    • 6.2 Typical installation principles
    • 6.3 Installation process
    • 6.4 Placement of signs and devices
      • 6.4.1 Two-way road – lane closure
      • 6.4.2 Two-way road (lateral shift)
      • 6.4.3 Two-way road – lane closure with side roads
      • 6.4.4 Multi-lane undivided road – lane closure
      • 6.4.5 Multi-lane divided road – left or right lane closure
    • 6.5 Positioning of signs and devices
    • 6.6 Typical locations for signs
      • 6.6.1 Long term
      • 6.6.2 Short term
    • 6.7 Orientation of signs and devices
    • 6.8 Tolerances
    • 6.9 ITS devices
  • 7. TGS Operations and Maintenance
    • 7.1 General
    • 7.2 Before work starts
    • 7.3 During the hours of work
    • 7.4 Aftercare – worksite arrangements outside working hours
    • 7.5 Record keeping
    • 7.6 Incidents
    • 7.7 TMI monitoring
    • 7.8 Monitor and measure TTM
    • 7.9 Excessive or inappropriate use of temporary speed limits
    • 7.10 Excessive signage
  • 8. TGS Removal
    • 8.1 General
    • 8.2 Typical removal principles
    • 8.3 Removal process
    • 8.4 Removal order for signs and devices
      • 8.4.1 Two-way road – lane closure
      • 8.4.2 Two-way road – lateral shift
      • 8.4.3 Two-way road – lane closure with side road intersections
      • 8.4.4 Multi-lane undivided road – lane closure
      • 8.4.5 Multi-lane divided road – left or right lane closure
  • 9. Low Light Works
    • 9.1 Activity during low light
    • 9.2 Artificial lighting
  • 10. Unattended Sites
  • 11. AGTTM Feedback
  • Appendix A Discontinued from Edition 1.1
  • Appendix B Sample Risk Assessment Form
  • Appendix C Sample TTM Toolbox Talk
  • Appendix D Sample Daily Traffic Management Diary