Test Methods and Specifications
Construction of Earthworks
- Publication no: ATS-2130-26
- Published: 4 November 2026
- Edition: 1.0
- PDF (free) Download
Austroads Technical Specification ATS 2130 sets out the requirements for the construction of Earthworks for road infrastructure.
This technical specification is also available as a Word document.
- 1. Scope
- 2. Referenced Documents
- 3. Definitions
- 4. Quality System Requirements
- 5. General
- 6. Management of Earthworks Materials
- 7. Borrow Operations
- 8. Stockpile Areas
- 9. Spoil Material
- 10. Clearing and Grubbing
- 11. Topsoil
- 12. Unsuitable Material
- 13. Problematic Soils
- 14. Contaminated Materials
- 15. Classification of Materials
- 16. Assessment and Treatment of the Existing Ground
- 17. Excavation
- 18. Blasting
- 19. Embankment Construction
- 20. Placement of Earth Fill
- 21. Placement of Rock Fill
- 22. Conformity – General
- 23. Deflection Testing
- 24. Conformity – Geometrics
- 25. Completion
- Annexure A Summary of Hold Points, Witness Points and Records
- Annexure B Typical Nomenclature for Embankments and Cuttings
- Annexure C Terracing and Shallow Embankment Requirements
- Annexure D Cut/Fill Transition Zone Requirements
- Amendment Record
- Attachment A Contract Specific Requirements
Related publications
There are no related publications.
Latest Test Methods and Specifications News