Austroads Technical Specification ATS 5140 sets out the requirements for the supply, assembly, installation, grouting, stressing and monitoring of ground anchors which are post-tensioned. It includes drilling, grouting and water testing, and sealing of the boreholes.

This Specification:

  • applies to both temporary and permanent ground anchors with appropriate corrosion protection systems installed into soil or rock;
  • may also be applied to anchors which are stressed directly to ground and to unstressed or lightly stressed tie-downs which anchor structures to rock or soil through intervening unsound stratum; and
  • applies to both strand and bar tendons.

The technical specification can also be downloaded as a Word document.

  • 1. Scope
  • 2. Referenced Documents
  • 3. Definitions
  • 4. Quality System Requirements
  • 5. Design
    • General
    • Corrosion Protection
    • General
    • Underhead Zone Protection
    • Temporary Anchors
  • 6. Materials
    • General
    • Tendons
    • Anchorages
    • Grout
    • Sheaths and Ducts
    • Strand/Bar Sheaths
    • Tendon Unbonded Length Ducts
    • Bond Length Ducts
    • Corrosion Inhibiting Compound (CIC)
    • Protective Caps
  • 7. Supply and Supervision
    • General
    • Critical Anchor Activities
    • Anchor Supervisor
    • Factory Grouted Tendons
  • 8. Installation of Proof and Suitability Anchors
  • 9. Assembly
    • General
    • Tendons
    • Grout Tubes
    • Spacers and Centralisers
    • Joints
    • Unbonded Length
    • Bond Length
    • Marking
    • Conformity Records
  • 10. Installation
    • General
    • Drilling
    • Cleaning
    • Borehole Testing
    • Pressure Grouting
    • Falling Head Grout Test
    • Water Testing
    • Conformity Records
    • Anchor Insertion
    • General
    • Insertion of Permanent Anchors Grouted In-situ
    • Water Testing of Inserted Anchor
    • Insertion of Factory Grouted Anchors
  • 11. Grouting
    • General
    • Performance
    • Mix Design and Testing
    • Mixing
    • Pumping Equipment
    • Procedure
    • General
    • Conformity Records
  • 12. Load Testing
    • General
    • Loading and Monitoring
    • Proof Tests
    • Suitability Tests
    • Acceptance Tests
    • Assessment and Acceptance Criteria
  • 13. Stressing
    • Commencement of Stressing Operations
    • Safety Precautions
    • Stressing Equipment
    • Measurement
    • Wedges
    • Preparatory Operations
    • Control of Stressing Operations
  • 14. Cutting Off of Stressed Tendons
  • 15. Monitoring
    • General
    • Short-Term Monitoring
    • Long-Term Monitoring
  • Annexure A: Summary of Hold Points, Witness Points and Records
  • Annexure B: Explanatory Diagrams
  • Annexure C: Load Testing
    • C.1 Minimum Frequency of Testing
    • C.2 Proof Test
    • C.3 Suitability Test
    • C.4 Acceptance Test