Table of Contents

7.2.6 Opening to Traffic

Traffic can be allowed on the seal almost as soon as the aggregate is spread and in fact can be beneficial to aid in quickly rolling the aggregate over to a stable position. Traffic speeds must be strictly controlled at this stage to avoid damage to the seal and risks associated with loose surface aggregate. All loose, surplus aggregate should be removed by sweeping before normal speed limits are restored.