Appendix C 2 Double/double Seal Carrying a High Percentage of Heavy Vehicles
An access road to an industrial subdivision has been initially sealed (7 mm) to cater for construction traffic. The final double/double seal is to be applied prior to opening to traffic, which is expected to include heavy vehicles delivering building and construction materials.
Both layers of the seal will be constructed on consecutive days prior to opening to traffic.
The climatic temperature conditions at the site are considered to be in the low category.